If the proposed LNG precinct goes ahead, access to this part of country will be cut off completely. Fishing will be finished because off the Explosive excavation during construction, dredging shipping channel: sedimentation, siltation, turbidity & reduced water quality. Change to the chemistry local water, Changes to the bottom topography, composition and nutrient flow due to tidal scoring, alterations of the alongshore current flow & available food regimes
• Explosive excavation during construction,
• 24/7 dredging shipping channel: sedimentation, siltation, turbidity & reduced water quality.
• Change to the chemistry local water with construction of breakwater.
• Changes to the bottom topography, composition and nutrient flow due to tidal scoring
• Major alterations of the alongshore current flow, with changes to the available food regimes
handsoffcountry 2 years ago
If the proposed LNG precinct goes ahead, access to this part of country will be cut off completely. Fishing will be finished because off the Explosive excavation during construction, dredging shipping channel: sedimentation, siltation, turbidity & reduced water quality. Change to the chemistry local water, Changes to the bottom topography, composition and nutrient flow due to tidal scoring, alterations of the alongshore current flow & available food regimes
handsoffcountry 2 years ago