Added: 2 years ago
From: TradOwnersSpeak
Views: 257
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (2)

Sign In or Sign Up now to post a comment!
  • • Explosive excavation during construction,

    • 24/7 dredging shipping channel: sedimentation, siltation, turbidity & reduced water quality.

    • Change to the chemistry local water with construction of breakwater.

    • Changes to the bottom topography, composition and nutrient flow due to tidal scoring

    • Major alterations of the alongshore current flow, with changes to the available food regimes

  • If the proposed LNG precinct goes ahead, access to this part of country will be cut off completely. Fishing will be finished because off the Explosive excavation during construction, dredging shipping channel: sedimentation, siltation, turbidity & reduced water quality. Change to the chemistry local water, Changes to the bottom topography, composition and nutrient flow due to tidal scoring, alterations of the alongshore current flow & available food regimes

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more