Added: 2 years ago
From: astropil01
Views: 11,075
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (15)

Sign In or Sign Up now to post a comment!
  • great job

  • good job man but too long, it takes to me 2 weeks to do the same size of the bathroom.

  • looks good..9K...wow..

  • very well done man , looks amazing!!!!!

  • Ventilation fan?

  • No, has a window.

  • nice job, why did it take

    2.5 months...?

  • I'm slow and deliberate, but a lot of the things took a while to figure out. For example, it took awhile to figure out how to best run the plumbing as it used to run up the wall that was between the old shower and vanity that was removed. Also, I found that I had to shim the (entire) walls behind the shower about 1/4 inch because the basin has a very thick drip lip on it. If I didn't shim the walls, the bottom row of tiles would have hit the lip. Lots of standing, staring and measuring.

  • Great job! Definitely inspiring, but looks like it was quite a bit of work!!

  • Nice job

  • Im looking at a similar project, what is the square footage of your bath area that includes the toilet, shower and vanity? Great job!

  • Thanks. About 44 sq ft

  • Great Job! Any regrets or tips b4 I start mine?

  • btww, pleassee upload more renovation videos!!

  • wow!!

    that look fantastic,

    i am also trying to renovate my bathroom, and you did an amazing job!!

    i love it. i want my bathroom to look like this!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more