Added: 4 years ago
From: northernnavvy
Views: 3,105
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (5)

Sign In or Sign Up now to post a comment!
  • they should never have closed the DC woodhead route in the first place, just re rigged it to 25kv AC

  • I didn't understand that, "We'll put it in the other tunnel for the time being." What's the point of doing that? If they're trying to re-open it as a train line, why would anyone want to be re-building a tunnelt that wouldn't belong to the railways? What's the point of this??? I'm totally lost!!

  • this public demonstration of common sense seems to have unfortunatly lost mo-mentuem and the power cable will probably stay ,as it would be very coslty to convert the main tunnel back to railuse

  • It'll never happen in this myopic country

  • This is a key transport corridor. We know this! We need it open as a double track Berne Gauge railway electrified at 25kv ac now!!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more