This meter is also installed in South Australia by AGL, who have theirs programmed a bit differently. In my case program number 23
01 Time (AEST)
02 Date
03 is Power and Light consumption
07 is Off Peak consumption (Hot water)
09 is Power exported to the grid
30 displays the program number. (The way your meter is setup)