Added: 2 years ago
From: ianschlehofer
Views: 10,119
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:
see all

All Comments (7)

Sign In or Sign Up now to post a comment!
  • actually according to USC/ FCCCHR, after flushing the TC's then you attach the bleed valve arrangement to TC #1 and High side hose to TC #2, you then open TC #2 and High side bleed needle valve to flush air from gauge and line, while flushing you can fill the air inlet to aid in determining when the air inlet opens, then close High side bleed needle valve, close shut off #2, THEN RAISE GAUGE TO PROPER ELEVATION (which is center of gauge in line with TC #2 THEN CLOSE SHUT OFF #1. ..............

  • vote up if you love clean water!

  • very good info.

    

  • PVBs KICK ASS!!

  • i finding these videos very helpful,im obtaining my cross connection tomorrow a little different how we do things up north though (for the rp)

  • Little faster.....AAAAYY

  • Little Faster on the PVB .... Otherwise good vid..EVEN though you're Canadian...AAAYYY..LOL

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more