Added: 3 years ago
From: kekiefer
Views: 10,788
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (5)

Sign In or Sign Up now to post a comment!
  • were all of these people computer engineer undergrad

  • yes

  • You can see in the first shot that moving the robot over one area on the table did provide some varied readings -- this was also a bad table for optical mice. Our rig to keep the height of the sensors consistently within the range that they'll accept worked reasonably well in an empirical sense (we were able to roughly calculate position and rotation), but we didn't perform any measurements of their accuracy, nor did we attempt to utilize the sensors as part of a closed loop feedback system.

  • Pretty awesome project. Was curious though, were the Agilent sensors consistent in their measurements? Was the robot where they reported it to be?

  • whats with the random music? kinda distracted me

  • I think the music enhances the video -- dramatizes what the robot is doing.

  • Thanks for the props. Especially since UCSB is on a quarters system, there's no way we could have done this in a single quarter. We had about 10 weeks to do the design, schematics, and board layout. In the next 10 weeks we waited for boards to be spun and populated and started some of the initial software work. In the final 10 weeks we did the rest of the software and did all the systems integration.

  • Kickass...I can't imagine it all got done in a single term, was it a year-long project course?

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more