Yeah it's seems that way, but all the water in the sand, would just flow down the pile, and take lots of matrials, that i have already swung up, with it down, making me digging it up again, plus the pile would only be 3/4 the size.
Here you really get the understanding, that the swing movement is unlimited on the excavator. Anyway, looks like a rather boring job for the operator ;)
Is it safe a long turn, 50% time you stand with back towards a water and dont see when bank slips.
alfrens 1 week ago
programmed of manual if so dont the operatery get the bends from going around in circles all day ?
okuma0kuma 2 years ago
why not swing right and drop it it would be much faster , and increase production
WVhoeman 2 years ago
Yeah it's seems that way, but all the water in the sand, would just flow down the pile, and take lots of matrials, that i have already swung up, with it down, making me digging it up again, plus the pile would only be 3/4 the size.
ArEs7210 2 years ago
well i guess your right about that
WVhoeman 2 years ago
Here you really get the understanding, that the swing movement is unlimited on the excavator. Anyway, looks like a rather boring job for the operator ;)
jacobskomager 2 years ago
Yeah not the most exciting job, but with the heater and radio on you get by
ArEs7210 2 years ago