Added: 4 years ago
From: RackS225
Views: 42,630
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (9)

Sign In or Sign Up now to post a comment!
  • Get rid of the music and explain the process.

  • 5 degrees not 85

  • that's funny

  • No . The guy is simply a jerk.

  • anyone still cutting like this in 2009 much less 2007, should be your 1st "red flag",i dont know of any small shop that dosent at least have a medium grade bridge saw, these guys above are the same guys showing up to your job with a s-10 as a installation vehicle, before you go asking what i have try 4 simec 625 bride saws, 2 intermac masterstone's, 1 flow water jet, an egar cnc, 4 pro edge 3's a dual bed loffler, and 4 f-550's with knuckle boom cranes, an a proliner for templating

  • lol that's some awesome "my penis is bigger than yours" material.

  • wow...who payed for all of that...im guessing some real idiots...or some real 'rich' people who really know nothing but how to memorize....or steal or rip off others.....or

  • yeah, don't let anything down storm drains, thats a big no no. People suck, huh?

  • Some guy just threatened to report my crew for cutting granite slab and letting the water run into the city drain. Is there a code against doing that or is this guy just being a jerk? We want to be environmentally conscious, but assumed that it is just natural stone. Thanks for any feedback you can give.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more